Vertical Subsurface Flow CW's: Performances
The removal efficiencies in the table below are based on the results of the pilot plant bult at the K.H.Kempen, Geel Belgium. The results are a processing of the results of the year 2009. The mesocosms were planted in spring 2007.
This analysis is based on mass balances, not concentrations.
Constructed Wetlands